Newton County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 10 - BUILDINGS AND BUILDING REGULATIONS / Article VIII - WIND ENERGY

Sec. 10-331. Installation and design.

About this text

  • As published by Municode, current through 2023-04-18
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) The installation and design of the wind energy facility shall conform to applicable industry standards, including those of the American National Standards Institute.

(b) All electrical and mechanical components of the wind energy facility shall conform to relevant and applicable local, state and national codes.

(c) The visual appearance of wind energy facilities shall at a minimum:

(1) Maintain a galvanized finish and be a non-obtrusive color such as white, off-white or gray;

(2) Not be artificially lighted, except to the extent required by the Federal Aviation Administration or other applicable authority that regulates air safety; or otherwise regulates lighting;

(3) Not display advertising (including flags, streamers or decorative items), except for identification of the turbine manufacturer, facility owner and operator. Size and design parameters shall be subject to approval during special use permit process.

History

The history line the source prints at the end of the section.

(Ord. No. O-120418a, § 25-104, 12-4-2018)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:newton-county/code/10-331@2023-04-18-8638d82060

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Newton County Code of Ordinances, Sec. 10-331. Installation and design | Georgia Commons