--- title: Newton County Code of Ordinances, Sec. 10-5. Construction documents collection: local-codes id: local-code:newton-county/code/10-5 cite_as: Newton County, Ga., Code of Ordinances § 10-5 canonical_url: https://georgiacommons.org/counties/newton/code/10-5 md_url: https://georgiacommons.org/counties/newton/code/10-5.md text_url: https://georgiacommons.org/counties/newton/code/10-5/text source_url: https://library.municode.com/ga/newton_county/codes/code_of_ordinances date: 2023-04-18 status: active jurisdiction: county:newton jurisdiction_name: Newton County county_fips: "13217" corpus_version: local-codes-newton-county-06c9c39fdfd1 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/newton/code/~part-ii/~chapter-10/~article-i.md previous: https://georgiacommons.org/counties/newton/code/10-4.md next: https://georgiacommons.org/counties/newton/code/10-6.md index: https://georgiacommons.org/counties/newton.md branch: code edition: As published by Municode, current through 2023-04-18 edition_date_kind: current_through source_publisher: Municode version_id: local-code:newton-county/code/10-5@2023-04-18-8bea7dccd2 --- # Newton County Code of Ordinances, Sec. 10-5. Construction documents > As published by Municode, current through 2023-04-18 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 10 - BUILDINGS AND BUILDING REGULATIONS / Article I - IN GENERAL (a) Submittal documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two or more sets with each application for a permit. The construction documents shall be prepared by a registered design professional. The design professional shall be an architect or engineer legally registered under the laws of this state regulating the practice of architecture or engineering and shall affix his/her/their official seal to said drawings, specifications and accompanying data, for the following: (1) All group, A, E, and I occupancies. (2) Buildings and structures three stories or high. (3) Buildings and structures 5,000 square feet (465 m2 ) or more in area. a. For all other buildings and structures, the submittal shall bear the certification of the applicant that some specific state law exception permits its preparation by a person not so registered. b. Where special conditions exist, the building official is authorized to require additional construction documents to be prepared by a registered design professional. c. Exceptions. The building official is authorized to waive the submission of construction documents and other data not required to be prepared by a registered design professional if it is found that the nature of the work applied for is such that reviewing of construction documents is not necessary to obtain compliance with this code. Construction documents for single-family and two-family dwellings, regardless of size, shall not be required to be prepared or certified by a registered design professional. 1. Information on construction documents. Construction documents shall be drawn upon suitable material. Electronic media documents are permitted to be submitted when approved by the building official. Construction documents shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of this code and relevant laws, ordinances, rules and regulations, as determined by the building official. 2. Manufacturer's installation instructions. Manufacturer's installation instructions, as required by this code, shall be available at the request of the inspector. 3. Information for construction in areas prone to flooding. For buildings and structures in flood hazard areas construction documents shall include: (i) Delineation of flood hazard areas, floodway boundaries, and flood zones, and the design flood elevation, as appropriate. (ii) The elevation of the proposed lowest floor, including basement, in areas of shallow flooding (AO zones) and the height of the proposed lowest floor, including basement, above the highest adjacent grade. (iii) If design flood elevations are not included on the community's flood insurance rate map (FIRM), the building official and the applicant shall obtain and reasonably utilize any design flood elevation and floodway data available from other sources. 4. Structural and fire resistance integrity. Plans for all buildings shall indicate how required structural and fire resistance integrity will be maintained where a penetration of a required fire resistance wall, floor or partition will be made for electrical, gas, mechanical, plumbing, signal and communication conduits, pipes and systems and also indicate in sufficient detail how the fire integrity will be maintained where required fire resistance floors intersect the exterior walls. 5. Hazardous occupancies. The building official may require the following: (i) General site plan. A general site plan drawn at a legible scale which shall include, but not be limited to, the location of all buildings, exterior storage facilities, permanent access ways, evacuation routes, parking lots, internal roads, chemical loading areas, equipment cleaning areas, storm and sanitary sewer accesses, emergency equipment and adjacent property uses. The exterior storage areas shall be identified with the hazard classes and the maximum quantities per hazard class of hazardous materials stored. (ii) Building floor plan. A building floor plan drawn to a legible scale, which shall include, but not be limited to, all hazardous materials storage facilities within the building and shall indicate rooms, doorways, corridors, exits, fire rated assemblies with their hourly rating, locations of liquid tight rooms, and evacuation routes. Each hazardous material storage facility shall be identified on the plan with the hazardous classes and quantity range per hazard class or the hazardous materials stored. (b) Site plan. The construction documents submitted with the application for permit shall be accompanied by a site plan, showing the size and location of new construction and existing structures on the site and distances from lot lines. In the case of demolition, the site plan shall show construction to be demolished and the location and size of existing structures and construction that are to remain on the site or plot. A site plan shall not be required for single-family or two-family dwellings, unless the necessity for a site plan is indicated on the final plat or the building official determines a site plan is necessary based on the existence of exceptional circumstances; for example, a significant change in topographical conditions. (c) Examination of documents. The building official shall examine, or cause to be examined, the accompanying construction documents, if required to be submitted, and shall ascertain by such examinations whether the construction indicated and described is in accordance with the requirements of this code and other pertinent laws or ordinances. (1) Approval of construction documents. When the building official issues a permit, the construction documents shall be approved in writing or by stamp. One set of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of work and shall be open to inspection by the building official or his/her/their authorized representative. (2) Previous approvals.This code shall not require changes in the construction documents, construction or designated occupancy of a structure for which a lawful permit has been heretofore issued or otherwise lawfully authorized, and the construction of which has been pursued in good faith within 180 days after the effective date of this code and has not been abandoned. (d) Amended construction documents. Work shall be installed in accordance with the reviewed construction documents, if required to be submitted, and any changes made during construction that are not in compliance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents. (e) Retention of construction documents. One set of approved construction documents, if required to be submitted, shall be retained by the building official for a period of not less than 180 days from date of completion of the permitted work or as required by state or local laws. ## History (Ord. No. O-111902, § 5, 11-19-2002; Ord. No. O-021814, § 5, 2-18-2014)