Located within the areas of special flood hazard established in article II, section 22-21, where streams with base flood elevation data are provided but no floodways have been designated, the following provisions apply: (a) When floodway data has not been provided in accordance with article II, section 22-21, then the floodplain administrator shall obtain, review, and reasonably utilize any scientific or historic floodway data available from a Federal, State, or other source, in order to administer the provisions of article IV only if data are not available from these sources, then the following provisions shall apply: (b) No encroachments, including structures or fill material, shall be located within an area equal to the width of the stream or 35 feet, whichever is greater, measured from the top of the stream bank, unless certification by a registered professional engineer is provided demonstrating that such encroachment shall not result in any increase in flood levels during the occurrence of the base flood discharge. (c) No encroachments, including structures or fill material, shall be located within the remaining area of special flood hazard beyond the limits of the area given in article IV, section 22-58(b), unless certification by a registered professional engineer is provided demonstrating that such encroachment, when combined with all other existing and anticipated development, shall not result in more than a three feet increase in flood levels during the occurrence of the base flood discharge. (d) New construction or substantial improvements of buildings shall be elevated or floodproofed to elevations established in accordance with article IV, section 22-56.