(a) New critical facilities shall not be located in the area of special flood hazard or the 0.2% annual chance floodplain. (b) All ingress and egress from any new or substantially improved critical facility must be protected to three feet above the base flood elevation or the 0.2% annual chance flood elevation, whichever higher. (c) The profile elevation of the centerline of all public streets shall be constructed a minimum of one foot above the base flood elevation. Exceptions to this provision may be granted by the board of zoning appeals in cases where construction of the street elevation below the base flood elevation would improve drainage or reduce the effects of flooding.