(a) Objective. The objective of the county speed hump program is to provide property owners a process to install asphaltic speed humps on county maintained neighborhood roads, where engineering studies indicate that their use would achieve the desired result of reducing neighborhood speeds and their installation is favored by a majority of the property owners in the neighborhood. (b) Formal petition requirements. To have speed humps installed in the county, a petition must be submitted to the board of commissioners. All of the property owners in the subdivision or defined service area should be contacted and given an opportunity to sign this petition, indicating their "yes" or "no" concerning the installation of speed humps. (1) Unless property is undergoing change of ownership, a wife's signature will not be acceptable if she is not the legal owner. If both husband and wife are joint legal owners, both signatures are required. A "Mr. and Mrs." signature is not acceptable. (2) The owners must sign individually. This includes owners of undeveloped lots; renting tenants are not an acceptable substitute for the legal homeowner. (3) No signature may be withdrawn from the petition after it is filed with the board of commissioners. a. The percentages will be calculated, based on individual lots where owners sign affirmatively, divided by the total number of lots in the plotted subdivision, units, or defined service area. Each lot counts as only one vote, regardless of the number of owners signing. At least 65 percent of the homeowners must vote in favor of the speed humps, before a petition can be presented to the board of commissioners. b. The completed petition must be signed, notarized and then returned to this office, where it will be checked against tax records and land lot maps to ensure that it meets all requirements. It will be returned to the sender if it does not meet the requirements. Petitions that do meet the requirements will be presented to the commissioners at its regular meeting. A public hearing will be announced at that time for each petition. At the public hearing, the petition will be approved or disapproved by the board of commissioners. 1. Installation. The installation of the speed humps by the contractor will not be considered final until personnel of this office inspects the humps for compliance with design specifications. 2. Time. The time span from receiving the petition to installation will be approximately four months or less. 3. Cost. Annualized charges for initial installation, maintenance and repair of speed humps are added to the property tax bills at the end of the year. Each platted lot, whether developed or not, will be subject to the assessed charges. The rate for participation in the speed hump program will be $12.00 per year per property in the defined service area. 4. Removal. Removal of speed humps can proceed if the board of commissioners is presented a formal petition requesting that speed humps be removed. At least 65 percent of the property owners must vote in favor of removing the speed humps. A petition to remove an installed speed hump must comply with the requirements of the formal petition to install a speed hump. A petition for removal will only be considered after speed humps have been in place for a period of at least one year after installation. (2001 Code, ยง 11-106(1); Ord. of 6-3-1997)