Pulpwood and logging operations, which desire to cross county ditches to enter property for the purpose of cutting, must apply for and be granted a permit by the county road department to cross said ditch. Said ditch may only be crossed after the contractor has paid the county for the installation of an approved culvert pipe, or said contractor may use his/her/their own pipe if approved by the road superintendent such that stormwater flow will not be restricted. Said contractor must restore said ditch line, backslopes, and road shoulders to original condition or better once his/her/their operations are complete in the area. In order to ensure the protection of the county's road and ditch structure the contractor must file an application for a permit with the county road department for each crossing. (2001 Code, ยง 11-104(2); Ord. No. O-120418c, 12-4-2018)