--- title: Newton County Code of Ordinances, Sec. 50-150. Construction inspections collection: local-codes id: local-code:newton-county/code/50-150 cite_as: Newton County, Ga., Code of Ordinances § 50-150 canonical_url: https://georgiacommons.org/counties/newton/code/50-150 md_url: https://georgiacommons.org/counties/newton/code/50-150.md text_url: https://georgiacommons.org/counties/newton/code/50-150/text source_url: https://library.municode.com/ga/newton_county/codes/code_of_ordinances date: 2023-04-18 status: active jurisdiction: county:newton jurisdiction_name: Newton County county_fips: "13217" corpus_version: local-codes-newton-county-06c9c39fdfd1 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/newton/code/~part-ii/~chapter-50/~article-iii/~division-4.md previous: https://georgiacommons.org/counties/newton/code/50-149.md next: https://georgiacommons.org/counties/newton/code/50-151.md index: https://georgiacommons.org/counties/newton.md branch: code edition: As published by Municode, current through 2023-04-18 edition_date_kind: current_through source_publisher: Municode version_id: local-code:newton-county/code/50-150@2023-04-18-c404ceb9f0 --- # Newton County Code of Ordinances, Sec. 50-150. Construction inspections > As published by Municode, current through 2023-04-18 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 50 - WATER RESOURCE MANAGEMENT / Article III - WATER RESOURCES MANAGEMENT / Division 4 - POST-CONSTRUCTION STORMWATER MANAGEMENT (a) Periodic inspection of the development site shall be made by the director to ensure that the stormwater management plan is properly implemented. (b) Upon completion of the construction phase on the project, and prior to approval of the final plat or issuance of a certificate of occupancy, the developer shall provide an as-built survey and an as-built design certification for each stormwater management facility. The as-built survey shall be prepared by a land surveyor currently registered in the state. A certified record drawing of the facility shall be prepared based upon this as-built survey. Based on the actual parameters established on the record drawing, an addendum to the stormwater management plan shall be prepared which demonstrates that the facility, as constructed, complies with the requirements of the approved stormwater management plan. The certified record drawing shall be certified by a professional engineer currently registered in the state. ## History (Ord. No. O-090506, § 400-070, 9-5-2006)