(a) Periodic inspection of the development site shall be made by the director to ensure that the stormwater management plan is properly implemented. (b) Upon completion of the construction phase on the project, and prior to approval of the final plat or issuance of a certificate of occupancy, the developer shall provide an as-built survey and an as-built design certification for each stormwater management facility. The as-built survey shall be prepared by a land surveyor currently registered in the state. A certified record drawing of the facility shall be prepared based upon this as-built survey. Based on the actual parameters established on the record drawing, an addendum to the stormwater management plan shall be prepared which demonstrates that the facility, as constructed, complies with the requirements of the approved stormwater management plan. The certified record drawing shall be certified by a professional engineer currently registered in the state.