Skip to content
Georgia Commons
Menu

Oconee County · Code of Ordinances

Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article 10 - PROJECT DESIGN AND CONSTRUCTION STANDARDS / Division I - PROJECT DESIGN / 1005 - Survey monuments.

Sec. 1005.01. Survey monuments required.

About this text

  • As published by Municode, current through 2026-04-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Documentation of monuments established by land survey are required for all subdivisions and developments as described more fully in this Sec. 1005. Such documentation must be consistent with requirements for both the Georgia Maps and Plats Act (O.C.G.A. 15-6-67) and for final subdivision plats under the Procedures and Permits Article of this Development Code.

a. Monuments shall be indicated on all plats intended to be recorded with the Clerk of the Superior Court.

b. All such monuments shall be properly set in the ground and shall be approved by a Registered Land Surveyor prior to the time of final plat approval.

c. Removal of monuments and resetting by anyone other than a Registered Land Surveyor is prohibited.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oconee-county/code/1005.01@2026-04-07-a08ce27c08

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.