Sec. 1008.03. Street classifications.

About this text

  • As published by Municode, current through 2026-04-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

For the purposes of this Development Code all of the streets, roads and highways in Oconee County are classified as local streets, minor collector and major collector streets, and arterials. The classification of each street in Oconee County is maintained on maps or records in the Public Works Department.

a. Designation.

(1) Streets shall be classified into a street hierarchy system as shown in Sec.

1008.04.a. Street design standards shall be based on road function and projected average daily traffic (ADT), calculated with trip generation rates published in the most recent edition of Trip Generation Manual by the Institute of Transportation Engineers.

(2) For residential lots, this will generally be equal to ten to 12 trips per day per single family lot and 16 to 18 trips per day per two family lot.

(3) Trip generation rates from other sources may be used if the applicant demonstrates that these better reflect local conditions at the sole discretion of Oconee County. Street classes and their corresponding ADT thresholds are:

found in Sec. 1008.04.a.

(4) Each street shall be classified and designed to that classification for its entire length. The applicant shall demonstrate that the distribution of traffic to the proposed street system shall not exceed the ADT thresholds for any of the proposed street classifications.

b. Private Streets.

(1) If and when a development plan indicates the construction of streets and utilities on private property, the owner shall indicate planned means for the maintenance of such streets and utilities.

(2) The construction specifications for such streets shall be the same as for public streets or the equivalent equal as approved by the Public Works Director and access shall be provided over such streets to an existing public street having a right-of-way of not less than 60 feet.

(3) In addition, the owner shall state, through an agreement prepared or approved by the local government's attorney, that the local government and Governing Body shall be relieved of any responsibility for the maintenance of said improvements.

(4) Such agreements shall conform to the Georgia Condominium Act if applicable, and shall receive such approval prior to the final review by the County.

c. Traffic Impact Studies. To assure that the provisions of the required streets in new land developments help prevent and reduce traffic congestion and hazards and to ensure the health, safety, and welfare of the traveling public, the County shall require the developer to provide traffic impact studies when the projected traffic from the development exceeds 500 ADT.

(1) The county will require a traffic impact study when the projected traffic from the development equals or exceeds 500 ADT combined for all entrances.

(2) The traffic projection shall be based on the developer's most intense use as allowed by the zoning on the property.

(3) The requirement and scope of the traffic impact study will be based on the nature of the development, existing background traffic volumes and patterns, and future development along the adjoining corridors. The intent of the impact study is to identify the impacts to capacity, level of service, and safety to existing corridors and the actions required to mitigate these impacts. The impact analysis shall also include traffic light synchronization files.

(4) The determination of the requirement for traffic impact studies shall be made by the County Engineer with consideration to the above criteria. The Design Professional of Record shall determine the scope of the impact study and obtain concurrence of the Public Works Director.

(5) The traffic impact study and proposed mitigation measures will be provided and considered as part of the approval process for the preliminary plat for subdivisions or the preliminary site plan or site development plan if the option is chosen to not submit a nonresidential preliminary site plan for review. The traffic impact study shall reflect the required standards for LOS as indicated in section 1206.04.

History

The history line the source prints at the end of the section.

(Res. of 2-4-2025(1), Exh. A; Res. of 10-07-2025(1), Exh. A)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oconee-county/code/1008.03@2026-04-07-f5803495ba

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.