--- title: Oconee County Code of Ordinances, Sec. 1013.03. Commercial/industrial subdivision entrances collection: local-codes id: local-code:oconee-county/code/1013.03 cite_as: Oconee County, Ga., Code of Ordinances ยง 1013.03 canonical_url: https://georgiacommons.org/counties/oconee/code/1013.03 md_url: https://georgiacommons.org/counties/oconee/code/1013.03.md text_url: https://georgiacommons.org/counties/oconee/code/1013.03/text source_url: https://library.municode.com/ga/oconee_county/codes/code_of_ordinances date: 2026-04-07 status: active jurisdiction: county:oconee jurisdiction_name: Oconee County county_fips: "13219" corpus_version: local-codes-oconee-county-3120a76e576b publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/oconee/code/~part-code-of-ordinances/~chapter-66/~article-10/~division-i.md previous: https://georgiacommons.org/counties/oconee/code/1013.02.md next: https://georgiacommons.org/counties/oconee/code/1013.04.md index: https://georgiacommons.org/counties/oconee.md branch: code edition: As published by Municode, current through 2026-04-07 edition_date_kind: current_through source_publisher: Municode version_id: local-code:oconee-county/code/1013.03@2026-04-07-d21ddad4e0 --- # Oconee County Code of Ordinances, Sec. 1013.03. Commercial/industrial subdivision entrances > As published by Municode, current through 2026-04-07 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article 10 - PROJECT DESIGN AND CONSTRUCTION STANDARDS / Division I - PROJECT DESIGN / 1013 - Deceleration lanes and turn lanes. a. A deceleration lane shall be installed at all entrance roads into a commercial or industrial subdivision connecting to a minor collector, major collector or arterial street with an ADT equal to or greater than 500 vehicles per day. See Sec. 1013.05, below. b. The Public Works Director may require a traffic study to determine if the project's size warrants a center turn lane, longer deceleration lane, an acceleration lane or other improvements. If the traffic study determines that the traffic generated by the project warrants it, the Public Works Director will require the additional improvements or other mitigating measures.