--- title: Oconee County Code of Ordinances, Sec. 1017.02. Pavement cuts collection: local-codes id: local-code:oconee-county/code/1017.02 cite_as: Oconee County, Ga., Code of Ordinances ยง 1017.02 canonical_url: https://georgiacommons.org/counties/oconee/code/1017.02 md_url: https://georgiacommons.org/counties/oconee/code/1017.02.md text_url: https://georgiacommons.org/counties/oconee/code/1017.02/text source_url: https://library.municode.com/ga/oconee_county/codes/code_of_ordinances date: 2026-04-07 status: active jurisdiction: county:oconee jurisdiction_name: Oconee County county_fips: "13219" corpus_version: local-codes-oconee-county-3120a76e576b publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/oconee/code/~part-code-of-ordinances/~chapter-66/~article-10/~division-i.md previous: https://georgiacommons.org/counties/oconee/code/1017.01.md next: https://georgiacommons.org/counties/oconee/code/1018.md index: https://georgiacommons.org/counties/oconee.md branch: code edition: As published by Municode, current through 2026-04-07 edition_date_kind: current_through source_publisher: Municode version_id: local-code:oconee-county/code/1017.02@2026-04-07-124dcf7f87 --- # Oconee County Code of Ordinances, Sec. 1017.02. Pavement cuts > As published by Municode, current through 2026-04-07 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article 10 - PROJECT DESIGN AND CONSTRUCTION STANDARDS / Division I - PROJECT DESIGN a. If utility services are installed after the streets have been paved (i.e., under existing streets), such utility services shall be installed by boring under the street. Note that this applies only to services and not the distribution system in the development. See Sec. 1008.05.h(11). b. When it is necessary for a subdivider or any utility company to break existing base or pavement for the installation of services, or any other purpose, the subdivider or utility company shall be financially responsible for the repair of the pavement. The pavement shall be repaired with a patch in accordance with standards developed by the Public Works Director, and in accordance with all other specifications required herein for construction of streets. (1) No existing County road can be open cut unless unusual circumstances warrant it. All utility construction plans within County right-of-way shall be reviewed and approved by the Public Works Director. (2) If a pavement cut is approved, all trenches shall be backfilled and compacted the same day the trench is opened. Trenches under the paving shall be returned to 95 percent compaction. The backfill in all such ditches will be thoroughly compacted in six-inch lifts, the subgrade shall be brought to the lines, grades, and typical roadway section required by County specifications. See also Sec. 1020 regarding excavating and trenching requirements.