--- title: Oconee County Code of Ordinances, Sec. 1021.03. Installation of utilities; general collection: local-codes id: local-code:oconee-county/code/1021.03 cite_as: Oconee County, Ga., Code of Ordinances ยง 1021.03 canonical_url: https://georgiacommons.org/counties/oconee/code/1021.03 md_url: https://georgiacommons.org/counties/oconee/code/1021.03.md text_url: https://georgiacommons.org/counties/oconee/code/1021.03/text source_url: https://library.municode.com/ga/oconee_county/codes/code_of_ordinances date: 2026-04-07 status: active jurisdiction: county:oconee jurisdiction_name: Oconee County county_fips: "13219" corpus_version: local-codes-oconee-county-3120a76e576b publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/oconee/code/~part-code-of-ordinances/~chapter-66/~article-10/~division-ii.md previous: https://georgiacommons.org/counties/oconee/code/1021.02.md next: https://georgiacommons.org/counties/oconee/code/1021.04.md index: https://georgiacommons.org/counties/oconee.md branch: code edition: As published by Municode, current through 2026-04-07 edition_date_kind: current_through source_publisher: Municode version_id: local-code:oconee-county/code/1021.03@2026-04-07-abdbe8c38c --- # Oconee County Code of Ordinances, Sec. 1021.03. Installation of utilities; general > As published by Municode, current through 2026-04-07 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article 10 - PROJECT DESIGN AND CONSTRUCTION STANDARDS / Division II - PROJECT CONSTRUCTION All utility crossings, service lines, conduit, or other related appurtenances shall be installed within the limits of the roadbed plus two feet of each side of the pavement surface, prior to the placement and compaction of the graded aggregate base course. Utilities should be installed following the installation of curb and gutter, unless the curb line is accurately staked at 50 foot intervals to insure proper utility locations as specified in Sec. 1017. The developer shall coordinate the location of all utilities and provide a copy of all as-built and proposed locations at final plat.