Skip to content
Georgia Commons
Menu

Oconee County · Code of Ordinances

Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article 11 - EROSION CONTROL AND STORMWATER MANAGEMENT / Division II - STORM DRAINAGE & STORMWATER MANAGEMENT

Sec. 1111. Purpose and intent.

About this text

  • As published by Municode, current through 2026-04-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The purpose of this Division is to protect, maintain, and enhance the public health, safety, environment, and general welfare of the citizens of Oconee County, Georgia by: the regulation of non-stormwater discharges to the storm drainage system to the maximum extent practicable as required by federal and state law; establishing minimum requirements and procedures to control the adverse effects of increased post-development stormwater runoff and nonpoint source pollution associated with new development and redevelopment;

and establishing inspection and maintenance requirements for existing privately owned detention facilities in the area of the County regulated under the National Pollutant Discharge Elimination System (NPDES) Stormwater Phase II Permit. It has been determined that proper management of stormwater runoff will minimize damage to public and private property and infrastructure, safeguard the public health, safety, environment and general welfare of the public, and protect water and aquatic resources. The objectives of this Division are:

a. Regulate the contribution of pollutants to the Oconee County separate storm sewer system by stormwater discharges by any user;

b. Prohibit illicit connections and discharges to the Oconee County separate storm sewer system;

c. Require that drainage easements are maintained in a proper manner;

d. Establish design and application criteria for the construction and use of structural stormwater control facilities that can be used to meet the minimum postdevelopment stormwater management standards;

e. Establish legal authority to carry out all inspection procedures necessary to ensure compliance with this Division.

f. Establish provisions for the long-term responsibility for and maintenance of structural stormwater control facilities and nonstructural stormwater management practices to ensure that they continue to function as designed, are maintained, and pose no threat to public safety.

g. In addition, for the area of the County regulated under the National Pollutant Discharge Elimination System (NPDES) Stormwater Phase II Permit and areas identified in Sec. 1113.d:

(1) Establish decision-making processes surrounding land development activities that protect the integrity of the watershed and preserve the health of water resources;

(2) Require that new development and redevelopment maintain the predevelopment hydrologic response in their post-development state as nearly as practicable in order to reduce flooding, stream bank erosion, nonpoint source pollution and increases in stream temperature, and maintain the integrity of stream channels and aquatic habitats;

(3) Establish minimum post-development stormwater management standards and design criteria for the regulation and control of stormwater runoff quantity and quality; and,

(4) Encourage the use of nonstructural stormwater management and stormwater better site design practices, such as the preservation of greenspace and other conservation

h. To promote the natural beauty and aesthetic qualities of Oconee County.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oconee-county/code/1111@2026-04-07-ce19d82157

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Oconee County Code of Ordinances, Sec. 1111. Purpose and intent | Georgia Commons