Skip to content
Georgia Commons
Menu

Oconee County · Code of Ordinances

Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article 11 - EROSION CONTROL AND STORMWATER MANAGEMENT / Division II - STORM DRAINAGE & STORMWATER MANAGEMENT / 1116 - Stormwater management in the urbanized area.

Sec. 1116.12. Maintenance responsibilities.

About this text

  • As published by Municode, current through 2026-04-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

a. The developer shall be responsible for removing temporary structures or facilities at the completion of the construction.

b. It shall be the responsibility of the developer to maintain all facilities required by the Stormwater Management Plan during construction and for a maintenance period following approval of the final subdivision plat or issuance of a certificate of occupancy, as applicable.

The maintenance period shall coincide with the continuing maintenance period required under the Required Improvements Section of the Project Design and Construction Standards Article of this Development Code regarding streets and drainage.

c. Should an owner or developer, whichever is the responsible party, fail to maintain the stormwater management facilities in a state of service intended by the Stormwater Management Plan, then the County shall notify the responsible party in writing of the deficiencies and specific minimum maintenance requirements to remedy such deficiencies.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oconee-county/code/1116.12@2026-04-07-b9a178a014

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.