Oconee County · Code of Ordinances
Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article 12 - PROCEDURES AND PERMITS / Division IV - OTHER PERMITS
Sec. 1223.02. Aquifer protection site plan requirements.
About this text
- As published by Municode, current through 2026-04-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Applications for a building permit or a development permit within the Aquifer Recharge Area shall include an aquifer protection site plan, with the exception of certain exempted activities identified in Sec. 1223.04.
a. A map shall be drawn to a scale of 1" = 50' or other appropriate scale as determined by Oconee County, showing all planned improvements including the width, depth, and length of all existing and proposed structures, roads, water courses, and drainage ways; water, wastewater, and storm water facilities; and utility installations.
b. Location, dimensions and area of all impervious surfaces, both existing and proposed, on the site.
c. The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body.
d. Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials.
e. Location of all potable water supply wells within 200 feet of the site, and all proposed onsite wells.
f. Calculations of the amount of cut and fill proposed and cross-sectional drawings showing existing and proposed grades in areas of fill or excavation. Elevations, horizontal scale, and vertical scale must be shown on cross-sectional drawings.
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.