Sec. 1231. Digital submission requirements: as-built data and final plats.

About this text

  • As published by Municode, current through 2026-04-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

As-built data and final plats submitted to the county shall be assessed an administrative fee based on the format of submission. Plans submitted in hardcopy format only will be assessed an administrative data entry fee on a per-parcel basis that will be set by the county yearly. Plans submitted in hardcopy and digital format (as described in subsections a-c, e & f below), but unprojected (per subsection d), will be assessed an administrative data entry fee on a per parcel basis that will be 10% of the determined rate for hardcopy only submission.

Plans submitted in hardcopy and projected digital format (as described in subsections a-f below) shall have administrative fees waived for their submission.

In addition to the requirements of this Development Code for the submission of printed copies, as-built data drawings and all final plats approved for recordation shall be submitted to the Planning Director in a digital format as follows:

a. Digital drawing files shall be submitted in AutoCAD DWG or DXF format and shall include:

(1) Final plat as approved.

(2) Model space drawing of the engineering plans, reflecting any changes approved by the county.

b. The DXF or DWG file shall have data divided into the following distinct and separate layers:

(1) Parcel Lines (PL)

(2) Right-Of-Way (ROW)

(3) Boundary (BL)

(4) Water Lines (WL), when available

(5) Sewer Lines (SL), when available

(6) Electrical Lines (EL), when available

(7) GPS Monuments, when required or available. A digital index spreadsheet in a Microsoft Excel compatible format must also be provided of the pipe chart.

c. In engineering plans, line and arc data must be unbroken where appropriate, such as no breaks in intersecting lot lines at corner pins and no breaks in utility lines.

d. The projection shall be in Georgia State Plane West Coordinate System North American Datum 1983.

e. Control shall be indicated.

f. Such additional information or requirements as may be established by the Planning Director or Oconee County GIS Administrator necessary to convert the DXF or DWG file to ArcGIS format.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oconee-county/code/1231@2026-04-07-5ee7c48d86

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.