Oconee County · Code of Ordinances
Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article 12 - PROCEDURES AND PERMITS / Division V - FINAL SUBDIVISION PLATS / 1232 - Final plat statements and certificates.
Sec. 1232.09. Procedure when the Design Engineer of Record cannot fulfill Final
About this text
- As published by Municode, current through 2026-04-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Subdivision Plat requirements.
This section describes the requirements and procedure when the design engineer of record can no longer fulfill the certification and inspection requirements of this code for reasons beyond his/her circumstance. In no case, shall non-payment of services by a developer or subsequent owners to the Engineer of record constitute the ability for filing a final plat review under the requirements of the section.
a. Provisions. The developer or individual seeking to file a final plat application under this code section shall provide to the County:
(1) An affidavit stating the reason(s) the Engineer of Record cannot fulfill certification requirements for the final plat.
(2) Site inspection and material sampling/testing shall be provided for at the discretion and direction of the Public Works Director or his/her designee.
(3) Each final subdivision plat shall carry a Design and Construction Certification completed by the Professional Certifying the final plat to read as shown on Figure 12.10.
(4) All other requirements and certifications of this code and of Division V, Final Subdivision Plat shall have been met.
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.