(a) All drawings, specifications and/or pertinent documents, required to bear the stamp, seal, and signature of a registered design professional shall be revised by the designer of record and bear that professional's seal and signature on all revisions and details. Required revisions to stamped plans are subject to the professional designer of record's approval, which shall be in the form of �hard-line� drawings. Fax transmittals, electronic submittals, or written correspondence may be deemed acceptable alternatives subject to approval by the fire marshal or the building official. (b) Certain minor corrections to plans, such as relocation of exit signs, sprinkler heads, smoke detectors or change of door swings, may be redlined as determined by each department. Redlined corrections shall be shown on all required sets of plans and/or specifications and shall bear the name and signature of the individual submitting the project for code compliance review. (c) Examples of items not allowed to be redlined are as follows; however, this is not an all-inclusive list: (1) Changes to the means of egress such as direction of travel, number of means of egress, egress width, travel distance, and other egress components. (2) Changes to the number of exits. (3) Changes to the features necessary for accessibility for the disabled. (4) Changes to fire alarm systems except as stated in the above subsection. (5) Changes to fire sprinkler systems to include site plans except as stated in the above subsection.