No building or structure shall hereafter be erected on a lot that does not abut for at least 40 feet upon an open street which shall be either a public street, a publicly maintained street, a private street easement, or an approved easement to a public street, unless such lot was properly platted and approved prior to July 2, 2019 and abuts for at least 25 feet on such an open street. The point of measurement for this requirement shall be at the street right-of-way or easement line, as applicable.