Skip to content
Georgia Commons
Menu

Oconee County · Code of Ordinances

Part - CODE OF ORDINANCES / Chapter 50 - ROADS / Article III - GRADING AND DRAINAGE / Division 1 - GENERALLY

Sec. 50-74. General principles.

About this text

  • As published by Municode, current through 2026-04-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Drainage of surface water should be provided away from all sides of all buildings and off the lot in a manner that will:

(1) Minimize the possibility of dampness in basements and crawl spaces;

(2) Prevent adverse supporting soil behavior;

(3) Prevent soil erosion; and

(4) Prevent standing or ponding of water on site.

(b) Walks, driveways, retaining walls and other improvements should be constructed so as not to interfere with drainage. Required walks should not be used as drainage channels. Site grading and drainage should:

(1) Provide suitable access from the abutting street to the dwelling and any accessory buildings;

(2) Provide immediate diversion of water away from buildings and off the site;

(3) Avoid concentrating runoff onto neighboring properties where erosion or other damage may be caused;

(4) Provide usable outdoor space for occupants; and

(5) Minimize erosion.

(c) The Georgia Erosion and Sedimentation Act of 1975, O.C.G.A. § 12-7-1 et seq., as amended, where applicable, shall apply.

History

The history line the source prints at the end of the section.

(Ord. of 11-6-1990(4), §§ 501, 502)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oconee-county/code/50-74@2026-04-07-4a16b45add

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.