Skip to content
Georgia Commons
Menu

Oconee County · Code of Ordinances

Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article 5 - SUBDIVISIONS AND PLANNED DEVELOPMENTS / 507 - Planned unit developments (PUD).

Sec. 507.09. Standards applying to planned institutional developments.

About this text

  • As published by Municode, current through 2026-04-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Within the OIP zoning district, a Planned Institutional Development (PID) may be permitted if it meets with the following standards and conditions:

a. Location. A Planned Institutional Development shall be located within an OIP Zoning District and shall have access and egress points only on a major collector street or arterial road which is maintained by the County or by the State D.O.T.

b. Minimum acreage. A Planned Institutional Development shall have a minimum area of at least 15 acres.

c. Use regulations. A Planned Institutional Development may contain "Institutional" uses as defined herein including but not necessarily limited to:

(1) Churches, schools, hospitals, nursing homes, clinics and personal care homes owned and operated by a for-profit entity or by non-profit organizations as defined under "Institution" herein.

(2) Planned retirement communities consisting of a mix of single family, two-family and multi-family dwellings, personal care and nursing care facilities.

(3) Customary accessory uses such as recreation facilities, food service facilities, office and administrative functions and in some cases pharmaceutical facilities.

d. Common open space requirements. Within a Planned Institutional Development, a minimum of ten percent (10%) of the total land area shall be reserved for common open space, parks or outdoor recreational facilities for use by the residents and/or clients of the development.

e. Lots. The requirement that each building or use be placed on a separate lot may be waived within a PID.

f. Yards. The yard requirements of the Zoning District in which the Planned Institutional Development is located may be waived except along the exterior boundaries of the development. On the exterior boundaries of the development, front, side and rear yards of appropriate widths shall be provided but in no case shall a yard be less than five (5) feet in width. These shall be determined at the time of rezoning or Planned Unit Development (PUD) plan approval and shall be based on the highest yard requirements for similar uses in other zoning districts (i.e., for single family dwellings, see AR-1 or R-1 zone; for hospitals, see OIP zone; etc.)

g. Gross density. For PID retirement communities, the density of the residential units shall not exceed that permitted by applicable rules for septic systems. For PID retirement communities on central sewer systems, the gross density of the residential units shall not exceed eight (8) units per acre where:

(1) Multi-family dwellings of 1, 2 or 3 bedrooms = one dwelling unit/apartment.

(2) Two-family dwellings of 1, 2 or 3 bedrooms = one dwelling unit/apartment.

(3) Single-family dwellings up to 3 bedrooms = one dwelling unit/house.

h. Nursing homes and hospitals with full-time comprehensive medical staff shall not be considered as residential units for calculation of gross density. Instead, such facilities shall be governed by the maximum height restrictions, off-street parking and loading requirements, buffer and green space requirements and any applicable yard requirements for the permitted use. The land area necessary for these requirements shall then be subtracted from the gross land area within the PID prior to calculating the gross residential density.

i. Off-street parking requirements. The off-street parking requirements for the various uses within PID developments shall be met in accordance with the Parking and Loading Requirements Article of this Development Code.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oconee-county/code/507.09@2026-04-07-fc132d185e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Oconee County Code of Ordinances, Sec. 507.09. Standards applying to planned institutional developments | Georgia Commons