Skip to content
Georgia Commons
Menu

Oconee County · Code of Ordinances

Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article II - WATER / Division 5 - WATER AND WASTEWATER SYSTEMS

Sec. 66-256. Elevation of wastewater connections, check prior to pouring foundation.

About this text

  • As published by Municode, current through 2026-04-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

It shall be the obligation of the owner of the building being connected to the county wastewater system to determine the elevations, grades and alignment of sewer lines necessary to serve the building prior to the pouring of the building foundation or footings, and to design and construct the connecting sewer in accordance with the information thus obtained.

Whenever possible, a building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which any building drain is too low to permit gravity flow to the county wastewater system, the wastewater carried by such building drain shall be lifted by an approved means into the county wastewater system. Operation and maintenance of such a lifting system shall be the sole responsibility of the property owner.

History

The history line the source prints at the end of the section.

(Ord. of 2-4-2003, § 2-76)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oconee-county/code/66-256@2026-04-07-0509141bd7

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.