--- title: Oconee County Code of Ordinances, Sec. 66-259. Water and wastewater connections collection: local-codes id: local-code:oconee-county/code/66-259 cite_as: Oconee County, Ga., Code of Ordinances § 66-259 canonical_url: https://georgiacommons.org/counties/oconee/code/66-259 md_url: https://georgiacommons.org/counties/oconee/code/66-259.md text_url: https://georgiacommons.org/counties/oconee/code/66-259/text source_url: https://library.municode.com/ga/oconee_county/codes/code_of_ordinances date: 2026-04-07 status: active jurisdiction: county:oconee jurisdiction_name: Oconee County county_fips: "13219" corpus_version: local-codes-oconee-county-3120a76e576b publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/oconee/code/~part-code-of-ordinances/~chapter-66/~article-ii/~division-5.md previous: https://georgiacommons.org/counties/oconee/code/66-258.md next: https://georgiacommons.org/counties/oconee/code/66-260.md index: https://georgiacommons.org/counties/oconee.md branch: code edition: As published by Municode, current through 2026-04-07 edition_date_kind: current_through source_publisher: Municode version_id: local-code:oconee-county/code/66-259@2026-04-07-830e0d029c --- # Oconee County Code of Ordinances, Sec. 66-259. Water and wastewater connections > As published by Municode, current through 2026-04-07 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article II - WATER / Division 5 - WATER AND WASTEWATER SYSTEMS (a) Construction procedures. (1) All pavement cuts shall be made by sawing prior to excavation to eliminate uneven and ragged edges. (2) All backfill beneath roads, sidewalks or other paved areas shall be compacted to 95 percent Standard Proctor using mechanical tamping equipment in six-inch lifts. It shall be the responsibility of the person making the water or sewer connection to demonstrate to the department director or his representative that 95 percent compaction has been obtained. (3) All road cuts shall have an eight-inch-thick concrete cap (3,000 psi in 28 days) which shall extend not less than 12 inches beyond the edges of the backfilled ditch. (4) Final asphalt patches shall match the existing pavement type, quality and thickness as closely as possible. Special care shall be exercised to match existing slopes and grades for a smooth transition. (b) Inspection of connections by county. The applicant for a building sewer connection permit shall notify the department director when the building sewer is ready for inspection and connection to the county wastewater system. The connection and testing shall be made in the presence of the department director or his representative. (c) Guarding excavations. All excavations for building sewer installation shall be adequately guarded with barricades and lights in compliance with all OSHA and state department of transportation requirements so as to protect the public from hazard. Streets, sidewalks, parkways and other public property disturbed in the course of the work shall be restored to "as good as new condition" in a manner satisfactory to the county. ## History (Ord. of 2-4-2003, § 2-79)