All water or wastewater construction work conducted on the public right-of-way or any public property shall be conducted only with proper permission from the department director. All disturbed areas as a result of such construction shall be restored to a condition that is "as good as new." The scheduling of such construction activities shall be as approved by the department director if such scheduling approval is determined to be in the public's best interest