(a) Lift stations serving two or more buildings. All wastewater lift stations installed in the county which serve two or more buildings shall be designed and constructed in strict conformity to the county standards. Engineering plans shall be prepared for all wastewater lift stations, and such plans shall be approved by the county water system prior to construction. Following the construction and acceptance by the county of a wastewater lift station, title to the lift station shall be conveyed to the county. (b) Lift stations serving a single building. Unless otherwise approved by the county, all wastewater lift stations serving a single building shall be owned, operated and maintained by the building owner.