(a) Permit required. All underground remediation projects that discharge to the sewer shall be required to possess a wastewater discharge permit before connecting to or contributing to the county system as required in section 66-324. (b) Equipment requirements. (LUST) remediation projects shall contain the following treatment equipment, including: (1) Pump. Contaminated groundwater is removed from the recovery wells. (2) Gravity separation. The groundwater must pass then through an API type oil/water separator with a minimum design API retention time of 30 minutes. (3) Volatile removal. The groundwater must then pass through one of the following devices to remove volatile organic compounds: a. A carbon adsorption unit. b. An air stripping device. c. A bio-reactor. d. An ultraviolet/peroxide oxidation device. (4) Metering. The water must then pass through a flow meter and an effluent sampling device (tap) before discharge to the sanitary sewer. Records of daily flow must be maintained and submitted on a monthly report. (c) Permit conditions. The permitting process shall require that the following discharge criteria and permit conditions must be met for continued use of the sewer system: (1) Discharge limits. Benzene = 20 ppb Toluene = 200 ppb Ethyl benzene = 70 ppb Xylene, total = 1,000 ppb Lead = 137 ppb Ph range, 5.5—12.5 S.U. Total Polynuclear aromatics (PNA) = 1 ppm (2) Sampling frequency. Based on the design flow of the treatment system (discharge rate in GPM). a. Start-up (first 30 days of operation). Discharge Indicator Pollutant* Total VOC Scan 1—10 GPM 2/week 1/week 10—25 GPM 3/week 1/week 25 GPM and up Daily 1/week b. On-line (after initial 30 day start-up of treatment system). Discharge Indicator Pollutant* Total VOC Scan 1—10 GPM 1/week 1/month 10—25 GPM 2/week 1/month 25 GPM and up Daily 1/month Indicator pollutant: Benzene for gasoline sites, TPH for diesel fuel location. (d) General conditions. (1) Air quality permit. If an air stripping device is to be used at a site, an air quality permit issued by the state EPD must be obtained, if necessary, by the permittee prior to issuance of a wastewater discharge permit. A copy of the air quality permit must be submitted with the wastewater discharge permit application. (2) Plans and specifications. The permit application shall be accompanied by a set of plans and specifications signed by a professional engineer registered in the state and include the following: a. Plot plan of the site, showing all buildings, sewers, storm sewers, natural streams, sewer connection points, process equipment locations and meter locations. b. A schematic diagram of the treatment system and the design criteria used to develop the treatment system. c. The operations manual, a totalO&M manual, including emergency shutdown procedures. (3) Site security. All permitted sites shall be fenced and locked to maintain adequate security. The county shall be provided with a copy of the key. (4) Pump control. The master pump control shall be clearly labeled and must be accessible to the permitting agency at all times. (5) Reporting frequency. The permittee shall report, on a monthly basis, to the county the following information: a. Sample data for the preceding month. b. Flow data for the preceding month on a daily basis. c. Off-site disposal of any material, to include what the material was, who disposed of it, the destination and mode of transportation. d. All violations must be reported within 24 hours of first becoming aware of the violation. (6) Inspection prior to permit issuance. The facility shall be inspected by a member of the county's environmental compliance program prior to issuance of a discharge permit.