Oconee County · Code of Ordinances

Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article III - SEWERS / Division 2 - NONDOMESTIC (INDUSTRIAL, COMMERCIAL, INSTITUTIONAL) USE OF PUBLIC WASTEWATER FACILITIES

Sec. 66-430. Industrial pretreatment facilities.

About this text

  • As published by Municode, current through 2026-04-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Requirement for. All users shall provide necessary wastewater pretreatment as required to comply with the limitations and provisions contained in this article and to achieve compliance with all federal categorical pretreatment standards within the time limitations as specified by the federal pretreatment regulations. Any facilities required to pretreat wastewater to a level acceptable to the county shall be provided, operated and maintained at the user's expense. Detailed plans prepared by a registered professional engineer showing the pretreatment facilities and operating procedures shall be submitted to the county for review and shall be acceptable to the county prior to commencement of construction of the facility. The review of such plans and operating procedures will in no way relieve the user of the responsibility for modifying the facility as necessary to produce an effluent acceptable to the county under the provisions of this chapter. Any subsequent changes in the pretreatment facilities or method of operation shall be reported to and be acceptable to the county prior to the user's initiation of the changes.

(b) Compliance schedules. The timing of construction and operation of pretreatment facilities as required hereby shall be in accordance with the compliance schedules provided by the county as described in section 66-427(b); however, the county shall also have the authority to issue compliance schedules independent of the permitting process and such compliance schedules may be enforced by the county as provided in the enforcement and penalties section of this chapter.

(c) Maintenance of pretreatment facilities. All wastewater pretreatment facilities shall be properly and adequately maintained by the user so as to achieve the intended purpose of the facilities.

(d) Peak flow periods. Whenever deemed necessary, the director may require users to restrict their discharge during peak flow periods, designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, separate sewage waste streams from industrial waste streams, and such other conditions as may be necessary to protect the POTW and determine the user's compliance with the requirements of this article.

(e) Suitable storage and flow-control facility. The director may require any person discharging into the POTW to install and maintain, on their property and at their expense, a suitable storage and flow-control facility to ensure equalization of flow. A wastewater discharge permit may be issued solely for flow equalization.

(f) Approved combustible gas detection meter. Users with the potential to discharge flammable substances may be required to install and maintain an approved combustible gas detection meter.

History

The history line the source prints at the end of the section.

(Ord. of 2-4-2003, § 20)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oconee-county/code/66-430@2026-04-07-49c5fb09be

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.