Skip to content
Georgia Commons
Menu

Oconee County · Code of Ordinances

Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article III - SEWERS / Division 2 - NONDOMESTIC (INDUSTRIAL, COMMERCIAL, INSTITUTIONAL) USE OF PUBLIC WASTEWATER FACILITIES

Sec. 66-432. Accidental discharges.

About this text

  • As published by Municode, current through 2026-04-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Protection against. Each significant industrial user shall provide protection from accidental discharge of prohibited materials or other substances regulated by this article.

Additionally, any person or industry which handles hazardous wastes, any priority pollutant as shown on the EPA list, or any prohibited materials shall, upon the request of the county, provide proof of protection from accidental discharge of hazardous wastes, priority pollutants, or prohibited materials. Facilities to prevent accidental discharge of prohibited materials shall be provided and maintained at the owner's or user's own cost and expense. Detailed plans prepared by a registered professional engineer showing facilities and operating procedures to provide this protection shall be submitted to the county for review, and shall be approved by the county before construction of the facilities. All existing users shall complete such a plan within 90 days after the effective date of the ordinance from which this article is derived.

Construction shall be completed within 180 days of approval of plans by the county. No significant industrial user who commences contribution to the county wastewater system after the effective date of the ordinance from which this article is derived shall be permitted to introduce pollutants into the system until accidental discharge procedures and facilities (if required) have been approved by the county. Review and approval of such plans and operating procedures shall not relieve the user from the responsibility to modify the user's facility as necessary to meet the requirements of this article.

(b) Notification required. Notification of accidental discharge shall be in accordance with section 66-427(f).

(c) Accidental discharge/slug control plans. At least once every two years, the director shall evaluate whether each significant industrial user needs an accidental discharge/slug control plan. The director may require any user to develop, submit for approval, and implement such a plan. Alternatively, the director may develop such a plan for any user. An accidental discharge/slug control plan shall address, at a minimum, the following:

(1) Description of discharge practices, including non-routine batch discharges;

(2) Description of stored chemicals;

(3) Procedures for immediately notifying the director of any accidental or slug discharge;

as required by section 66-427; and

(4) Procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants, including solvents, and/or measures and equipment for emergency response.

History

The history line the source prints at the end of the section.

(Ord. of 2-4-2003, § 22)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oconee-county/code/66-432@2026-04-07-561265b539

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.