The director may require the installation of the required backflow prevention assembly immediately or within a shorter time period than specified in section 66-59 if he determines that any condition poses a threat of contamination to the public water supply system. All new construction plans and specifications shall be made available to the director for approval and to determine the degree of hazard. All devices required for new construction shall be installed, tested, and inspected by the county utility department prior to release of certificate of occupancy by the county. The director shall be notified by the customer when the nature of the use of property changes so as to change the hazard classification of the property if necessary.