Each backflow prevention assembly required under this division must be accessible to the county utility department. When it is not possible to interrupt water service, the customer shall provide for the parallel installation of an approved backflow prevention assembly. The director will not accept an unprotected bypass around a backflow preventer when the assembly is in need of testing, repair or replacement. Any repair to backflow assemblies deemed necessary, whether through annual testing or routine inspection by the owner or by the county, must be completed within a time specified in accordance with the degree of hazard. Repairs on a private water system considered to be an imminent hazard shall be completed within 24 hours, a high hazard shall be completed within ten days, and all other repairs within 20 days. Failure to comply can result in termination of a customer's water service. Upon determination that a backflow prevention assembly is required to be installed on a customer's private water system, the customer will be notified in writing of the approved backflow prevention assembly which is required. On existing systems, the customer will have the following time periods within which to install the specified backflow prevention assembly: (1) Air-gap separation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 days (2) Reduced pressure principle assembly (3 /4″—24″) . . . . . . . . . . . . . . . . . . . 60 days (3) Double checkvalve assembly (3 /4″—24″) . . . . . . . . . . . . . . . . . . . . . . . . . . . 60 days (4) Other approved backflow prevention assembly . . . . . . . . . . . . . . . . . . . . 60 days (Ord. of 2-1-2000, § 1.04)