a. Conservation corridors; stream buffers required. Along all watercourses within a water supply watershed, the conservation corridors shown on the Future Land Use Map shall be shown on all plans and plats proposing urbanized development as defined by Sec. 1113.d and shall be protected by the following: (1) Within 7 miles upstream from a public water supply intake or reservoir: (a) A minimum 100-foot wide undisturbed buffer as measured outwardly and horizontally from the uppermost part of each stream bank; and (b) A minimum setback from the stream buffer of 50 feet for all impervious surfaces, septic tanks and their drainfields. (2) Beyond 7 miles upstream from a public water supply intake or reservoir in a small water supply watershed: (a) A minimum 50-foot wide undisturbed buffer as measured outwardly and horizontally from the uppermost part of each stream bank; and (b) A minimum setback from the stream buffer of 25 feet for all impervious surfaces, septic tanks and their drainfields. b. Exceptions. No vegetation shall be removed from within the conservation corridor except as allowed under Sec. 905.02 and except as allowed for under Georgia Forestry Best Management Practices, and (1) Disturbance is required to construct mulched pedestrian paths; (2) Road and utility crossings; and (3) For the installation of a dam necessary for stormwater detention or green stormwater infrastructure as approved by the Director of Public Works. c. Construction plans. No construction plans for a development containing a conservation corridor will be released until copies of all necessary state and federal permits have been provided to Oconee County.