--- title: Oconee County Code of Ordinances, Sec. 908.02. Conservation corridors in other watersheds collection: local-codes id: local-code:oconee-county/code/908.02 cite_as: Oconee County, Ga., Code of Ordinances ยง 908.02 canonical_url: https://georgiacommons.org/counties/oconee/code/908.02 md_url: https://georgiacommons.org/counties/oconee/code/908.02.md text_url: https://georgiacommons.org/counties/oconee/code/908.02/text source_url: https://library.municode.com/ga/oconee_county/codes/code_of_ordinances date: 2026-04-07 status: active jurisdiction: county:oconee jurisdiction_name: Oconee County county_fips: "13219" corpus_version: local-codes-oconee-county-3120a76e576b publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/oconee/code/~part-code-of-ordinances/~chapter-66/~article-9/~division-ii.md previous: https://georgiacommons.org/counties/oconee/code/908.01.md next: https://georgiacommons.org/counties/oconee/code/909.md index: https://georgiacommons.org/counties/oconee.md branch: code edition: As published by Municode, current through 2026-04-07 edition_date_kind: current_through source_publisher: Municode version_id: local-code:oconee-county/code/908.02@2026-04-07-3f2f08e1cc --- # Oconee County Code of Ordinances, Sec. 908.02. Conservation corridors in other watersheds > As published by Municode, current through 2026-04-07 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article 9 - ENVIRONMENTAL PROTECTION / Division II - WATERSHED PROTECTION / 908 - Other watershed areas. a. Conservation corridors; stream buffers required. The conservation corridors shown on the Future Land Use Map shall be shown on all plans and plats proposing urbanized development as defined by Sec. 1113.d and shall be protected by the following: (1) A minimum 50-foot wide undisturbed buffer as measured outwardly and horizontally from the uppermost part of each stream bank; and (2) A minimum setback from the stream buffer for all impervious surfaces, septic tanks and their drainfields equal to the applicable minimum principal building setback required by the zoning district. b. Exceptions. No vegetation shall be removed from within the conservation corridor except as allowed under Sec. 905.02 and except as allowed for under Georgia Forestry Best Management Practices, and (1) Disturbance is required to construct mulched pedestrian paths; (2) Road and utility crossings; and (3) For the installation of a dam necessary for stormwater detention or green stormwater infrastructure as approved by the Director of Public Works. c. Construction plans. No construction plans for a development containing a conservation corridor will be released until copies of all necessary state and federal permits have been provided to Oconee County.