All utilities shall be installed a minimum of 11 /2 feet from the edge of the pavement or the back of the curb. Utilities, not including service taps, installed beyond the right-of-way due to topographical conditions shall include a utility easement on the lot. All utilities and service taps shall be installed three feet below the working surface while within the right-of-way or easement.