(a) Sub-grade work consists of obtaining and placing suitable sub-grade material on the top six inches of the roadway, mixing, compacting and shaping to grade and cross section. This work also includes sub-grade stabilization. The entire surface of the roadway (width of pavement plus one foot left and right) shall be plowed, harrowed and mixed to a depth of at least six inches. After the material has been thoroughly mixed, the sub-grade shall be compacted to 100 percent of the maximum density. Sheep foot rollers are required. (b) Sub-grade material shall be of a suitable soil as defined by the current state department of transportation specifications. If such material is not available on site, it shall be furnished by the developer. On site materials not meeting the above criteria may be stabilized with crushed stone as defined in the current state department of transportation specifications.