--- title: Paulding County Code of Ordinances, Sec. 62-34. Placement of utilities on existing street collection: local-codes id: local-code:paulding-county/code/62-34 cite_as: Paulding County, Ga., Code of Ordinances § 62-34 canonical_url: https://georgiacommons.org/counties/paulding/code/62-34 md_url: https://georgiacommons.org/counties/paulding/code/62-34.md text_url: https://georgiacommons.org/counties/paulding/code/62-34/text source_url: https://library.municode.com/ga/paulding_county/codes/code_of_ordinances date: 2025-12-09 status: active jurisdiction: county:paulding jurisdiction_name: Paulding County county_fips: "13223" corpus_version: local-codes-paulding-county-bd4ed03a5061 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/paulding/code/~part-ii/~chapter-62/~article-ii.md previous: https://georgiacommons.org/counties/paulding/code/62-33.md next: https://georgiacommons.org/counties/paulding/code/62-35.md index: https://georgiacommons.org/counties/paulding.md branch: code edition: As published by Municode, current through 2025-12-09 edition_date_kind: current_through source_publisher: Municode version_id: local-code:paulding-county/code/62-34@2025-12-09-e2c6f79994 --- # Paulding County Code of Ordinances, Sec. 62-34. Placement of utilities on existing street > As published by Municode, current through 2025-12-09 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 62 - ROADS / Article II - UTILITY INSTALLATION IN OR ALONG PUBLIC WAYS Any person desiring to install a utility within a public way shall submit design drawings and specifications to the county for review and approval. At a minimum, the following guidelines apply to all installations permitted hereunder. (1) As the county intends for all roads or streets to have a pavement width of at least 24 feet, all utility placements should be placed with the future edge of pavement starting at least 12 feet off the centerline. (2) All utility installations shall be located close to the rear edge of the right-of-way of the public way. (3) No utility installations shall include parallel lines, unless the parallel lines are within the same ditch. Should a new line be required, the removal and/or abandonment of the existing lines shall be mandatory. (4) Utility placements on unimproved county roads are subject to relocation and removal upon the improvement or alteration of the public way. ## History (Code 1987, § 17-5; Res. No. 98-30, § C(2), 12-8-1998)