Any person desiring to install a utility within a public way shall submit design drawings and specifications to the county for review and approval. At a minimum, the following guidelines apply to all installations permitted hereunder. (1) As the county intends for all roads or streets to have a pavement width of at least 24 feet, all utility placements should be placed with the future edge of pavement starting at least 12 feet off the centerline. (2) All utility installations shall be located close to the rear edge of the right-of-way of the public way. (3) No utility installations shall include parallel lines, unless the parallel lines are within the same ditch. Should a new line be required, the removal and/or abandonment of the existing lines shall be mandatory. (4) Utility placements on unimproved county roads are subject to relocation and removal upon the improvement or alteration of the public way.