(a) In the event an owner/developer intends to construct sewer lines and dedicate them to the county for perpetual maintenance, the following procedures must be met: (1) The design, specifications, route and materials utilized in the construction and installation of the sewer line must be approved by the director of water systems or his representative prior to the construction of the sewer line; (2) The sewer line shall be inspected and approved throughout construction by the director of water systems or his representative; (3) The sewer line shall be inspected and approved at an inspection conducted after the completion of the installation of the sewer line by the director of water systems or his representative, including but not limited to, a video inspection; and (4) The sewer line shall be officially dedicated to the county in the form of a deed naming the grantee of the property as Paulding County, Georgia, by and through its board of commissioners; (5) A maintenance bond for the portion of the sewer line which is to be dedicated to the county for perpetual maintenance has been issued in an amount consistent with the bonding requirements for sewer construction as set forth in the most current version of the county development regulations; and (6) An 18-month warranty period from the date of the inspection conducted after the completion of the construction of the sewer line has been completed and the director of water systems or his representative has approved the working order of the sewer line and has authorized its acceptance by the county. (b) Sewer lines which are to be dedicated to the county in accordance with this article shall become the property of the county upon the sewer line's dedication and deed subject to the warranty and bonding requirements provided for in this article. All property rights as to the sewer lines and decisions regarding third party connection thereto are at the discretion of the county.