--- title: Paulding County Code of Ordinances, Sec. 66-161. Pretreatment collection: local-codes id: local-code:paulding-county/code/66-161 cite_as: Paulding County, Ga., Code of Ordinances § 66-161 canonical_url: https://georgiacommons.org/counties/paulding/code/66-161 md_url: https://georgiacommons.org/counties/paulding/code/66-161.md text_url: https://georgiacommons.org/counties/paulding/code/66-161/text source_url: https://library.municode.com/ga/paulding_county/codes/code_of_ordinances date: 2025-12-09 status: active jurisdiction: county:paulding jurisdiction_name: Paulding County county_fips: "13223" corpus_version: local-codes-paulding-county-bd4ed03a5061 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/paulding/code/~part-ii/~chapter-66/~article-iii/~division-4.md previous: https://georgiacommons.org/counties/paulding/code/66-160.md next: https://georgiacommons.org/counties/paulding/code/66-162.md index: https://georgiacommons.org/counties/paulding.md branch: code edition: As published by Municode, current through 2025-12-09 edition_date_kind: current_through source_publisher: Municode version_id: local-code:paulding-county/code/66-161@2025-12-09-459157d98c --- # Paulding County Code of Ordinances, Sec. 66-161. Pretreatment > As published by Municode, current through 2025-12-09 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 66 - SEWERS / Article III - SEWER USE / Division 4 - RESTRICTED USE OF PUBLIC SEWER Persons discharging industrial wastes into the sewerage system may be required to pretreat such wastes. Plans for all pretreatment facilities shall be approved by the director or the state environmental protection division prior to construction. At the time written plans are submitted for approval, written maintenance plans shall also be submitted and approved by the director. The facilities shall be allowed to operate only as long as they are maintained in accordance with the approved maintenance plans. Pretreatment requirements shall be determined on a case-by-case basis and shall include the following facilities as a minimum: (1) Neutralization. If plans are submitted for the neutralization of strong acid or alkaline wastes, the plans shall include the necessary instrumentation and controls to assure compliance with the above regulations at all times. (2) Equalization. Holding tanks or equalization basins shall be required ahead of the receiving manhole of the county sewerage system when deemed necessary by the director to prevent peak flows that exceed the capacity of the system or that result in operational problems. (3) All pretreatment facilities shall be operated and maintained continuously in satisfactory and effective operation by the owner at his expense. ## History (Code 1987, § 18-7(k))