--- title: Paulding County Code of Ordinances, Sec. 66-164. Responsibility of discharger collection: local-codes id: local-code:paulding-county/code/66-164 cite_as: Paulding County, Ga., Code of Ordinances § 66-164 canonical_url: https://georgiacommons.org/counties/paulding/code/66-164 md_url: https://georgiacommons.org/counties/paulding/code/66-164.md text_url: https://georgiacommons.org/counties/paulding/code/66-164/text source_url: https://library.municode.com/ga/paulding_county/codes/code_of_ordinances date: 2025-12-09 status: active jurisdiction: county:paulding jurisdiction_name: Paulding County county_fips: "13223" corpus_version: local-codes-paulding-county-bd4ed03a5061 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/paulding/code/~part-ii/~chapter-66/~article-iii/~division-4.md previous: https://georgiacommons.org/counties/paulding/code/66-163.md next: https://georgiacommons.org/counties/paulding/code/66-165-to-66-199.md index: https://georgiacommons.org/counties/paulding.md branch: code edition: As published by Municode, current through 2025-12-09 edition_date_kind: current_through source_publisher: Municode version_id: local-code:paulding-county/code/66-164@2025-12-09-9bf3a7366f --- # Paulding County Code of Ordinances, Sec. 66-164. Responsibility of discharger > As published by Municode, current through 2025-12-09 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 66 - SEWERS / Article III - SEWER USE / Division 4 - RESTRICTED USE OF PUBLIC SEWER It shall be the responsibility of the person discharging industrial waste into the county sewerage system to: (1) Build a control structure in the discharge line from his premises, immediately prior to the entrance of the discharge line into the county sewerage system, suitable for the sampling and measuring of wastes. Plans for this structure must be approved by the board of commissioners. This requirement may be waived if deemed unnecessary by the commission. If no special manhole is required, the control manhole shall be considered to be the nearest downstream manhole in the public sewer to the point at which the building sewer is connected. (2) Contact the director prior to operation changes which will materially alter characteristics of the waste from the last prior sampling. (3) Make timely, periodic payments to the county for surcharges for excessive loadings as called for by the most current rate schedule. ## History (Code 1987, § 18-7(n))