It shall be the responsibility of the person discharging industrial waste into the county sewerage system to: (1) Build a control structure in the discharge line from his premises, immediately prior to the entrance of the discharge line into the county sewerage system, suitable for the sampling and measuring of wastes. Plans for this structure must be approved by the board of commissioners. This requirement may be waived if deemed unnecessary by the commission. If no special manhole is required, the control manhole shall be considered to be the nearest downstream manhole in the public sewer to the point at which the building sewer is connected. (2) Contact the director prior to operation changes which will materially alter characteristics of the waste from the last prior sampling. (3) Make timely, periodic payments to the county for surcharges for excessive loadings as called for by the most current rate schedule.