The size, slope, alignment, materials of construction of a building sewer, and the methods to be used in construction shall all conform to the requirements of the building and plumbing code or other applicable rules and regulations of the county. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the American Society for Testing and Materials (ASTM) and the Water Pollution Control Federation (WPCF) Manual of Practice No. 9 shall apply. Additionally, the following materials and methods shall apply to building sewers within county supervision: (1) The building sewer shall be cast iron soil pipe, ASTM Specification A74, latest revision or equal; ductile iron pipe, American National Standards Institute (ANSI) Specification A21.51, latest revision, or equal or polyvinyl chloride (PVC) sewer pipe, ASTM Specification D3034, latest revision. All joints shall be tight and waterproof. Any part of the building sewer that is located within ten feet of a water service pipe shall be constructed of cast iron soil pipe of ductile iron pipe. Bolted mechanical joints may be required by the director where the sewer is exposed to damage by tree roots. If installed in filled or unstable ground, the building sewer shall be of cast iron soil pipe except that plastic pipe may be acceptable if laid on a suitable concrete bed or cradle as approved by the director. (2) The size and slope of the building sewer shall be subject to the approval of the director, but in no event shall the diameter be less than four inches. The slope of such four-inch pipe shall not be less than one-eighth inch per foot. Furthermore, the appropriate requirements of the Occupational Health and Safety Act (OSHA) shall be followed. (3) The depth shall be sufficient to afford protection from frost, and the building sewer shall be laid at uniform grade and with straight alignment insofar as possible. Changes in direction shall be made only with properly curved pipe and fittings. Building sewers shall not be placed in the same trench with water service lines. (4) An excavation required for the installation of a building sewer shall be open trench work unless otherwise approved by the director. Pipe laying and backfilling shall be performed in accordance with ASTM Specification C12, latest revision, except that no backfill shall be placed until the work has been inspected and approved. (5) All joints and connections shall be made gastight and watertight. Push-on joints for cast iron soil pipe shall have neoprene gaskets in accordance with the requirements of ASTM Specification C-564. Push-on joints for ductile iron pipe shall also have neoprene gaskets and be installed according to the manufacturer's recommendations. PVC pipe, joint material shall be of the bell and spigot type, sealed with a rubber "O"-ring gasket having a composition and texture which is resistant to the common ingredients of sewage, industrial wastes (including oils), and groundwater which will endure permanently under the conditions likely to be imposed by this use. Installation of gaskets shall be done in accordance with the pipe manufacturer's instruction using all the necessary materials, lubricants, and equipment recommended by the manufacturer. (6) The connection of the building sewer into the public sewer shall be made at the "Y" branch, if such a branch is available at a suitable location. If the public sewer is 12 inches in diameter or less, and no properly located "Y" branch is available, the county shall, at the owner's expense, cut a neat hole into the public sewer, with entry in the downstream direction at an angle of about 45 degrees, and install a 45-degree elbow with the spigot end cut so as not to extend past the inner surface of the public sewer. The invert of the building sewer at the point of the connection shall be at an elevation of at least one-tenth foot above the invert of the public sewer. A neat and smooth joint shall be made, and the connection made secure and watertight by encasement in concrete. Special fittings may be used for the connection only when approved by the director.