Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor, but above the top of the manhole of the manhole upstream and downstream from the connection. Where such a connection is not possible, the county assumes no responsibility for damage to property from backups in the sewer due to blockages, flooding, collapse of the line or other unavoidable situations. No building sewer shall be laid parallel to or within three feet of any bearing wall which might thereby be weakened. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by such building drain shall be lifted by an approved means and discharged to the building sewer.