Skip to content
Georgia Commons
Menu

Peach County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 14 - BUILDINGS AND BUILDING REGULATIONS / Article III - FLOW RATE RESTRICTIONS ON PLUMBING FIXTURES

Sec. 14-48. Construction of residential buildings with certain plumbing prohibited.

About this text

  • As published by Municode, current through 2023-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

On or after July 1, 1991, no construction may be initiated within the unincorporated limits of the county, for any residential building of any type which:

(1) Employs a gravity tank-type, flushometer-valve, or flushometer-tank toilet that uses more than an average of 1.6 gallons of water per flush; provided, however, that this subsection shall not be applicable to one piece toilets until July 1, 1992.

(2) Employs a showerhead that allows a flow of more than an average of 2.5 gallons of water per minute at 60 pounds per square inch of pressure.

(3) Employs a urinal that uses more than an average of 1.0 gallons of water per flush.

(4) Employs a lavatory faucet or lavatory replacement aerator that allows a flow of more than 2.0 gallons of water per minute.

) I ) )

(5) Employs a kitchen faucet or kitchen replacement aerator that allows a flow of more than 2.5 gallons of water per minute.

History

The history line the source prints at the end of the section.

(Ord. of 2-12-91, § 2)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:peach-county/code/14-48@2023-11-14-954be1e18e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.