--- title: Peach County Code of Ordinances, Sec. 26-353. General provisions collection: local-codes id: local-code:peach-county/code/26-353 cite_as: Peach County, Ga., Code of Ordinances § 26-353 canonical_url: https://georgiacommons.org/counties/peach/code/26-353 md_url: https://georgiacommons.org/counties/peach/code/26-353.md text_url: https://georgiacommons.org/counties/peach/code/26-353/text source_url: https://library.municode.com/ga/peach_county/codes/code_of_ordinances date: 2023-11-14 status: active jurisdiction: county:peach jurisdiction_name: Peach County county_fips: "13225" corpus_version: local-codes-peach-county-489c97dbbb75 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/peach/code/~part-ii/~chapter-26/~article-viii.5.md previous: https://georgiacommons.org/counties/peach/code/26-352.md next: https://georgiacommons.org/counties/peach/code/26-354.md index: https://georgiacommons.org/counties/peach.md branch: code edition: As published by Municode, current through 2023-11-14 edition_date_kind: current_through source_publisher: Municode version_id: local-code:peach-county/code/26-353@2023-11-14-34fce1e632 --- # Peach County Code of Ordinances, Sec. 26-353. General provisions > As published by Municode, current through 2023-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 26 - ENVIRONMENT / Article VIII.5 - POST DEVELOPMENT STORMWATER MANAGEMENT (a) Applicability. (1) This article shall be applicable to all land development, including, but not limited to, site plan applications, subdivision applications, land disturbance applications and grading applications, unless exempt pursuant to subsection (2) below. These standards apply to any new development or redevelopment site that meets one or more of the following criteria: a. New development that involves the creation of 5,000 square feet or more of impervious cover, or that involves other land development activities or land disturbing activities of one (1.0) acre or more; b. Redevelopment that includes the creation, or addition of 5,000 square feet or more of impervious cover, or that involves other land development activity of one (1.0) acre or more; c. Any new development or redevelopment, regardless of size, that is defined by the county administrator (or designee) to be a hotspot land use; or land development activities that are smaller than the minimum applicability criteria set forth in items a and b above, if such activities are part of a larger common plan of development (i.e. Subdivisions), even though multiple, that is a part of separate and distinct land development activities that may take place at different times on different schedules. (2) In order to avoid excessive regulation on individual residential lots, maintenance and repair efforts, and environmental projects, the following development activities are exempt from this article: a. Individual single-family or duplex residential lots disturbing less than one (1.0) acre that are not part of a subdivision or phased development project; b. Additions or modifications to existing single-family or duplex residential structures; c. Minor land disturbing activities (such as home gardens and individual home landscaping, repairs, maintenance work, fences and other related activities which result in minor soil erosion) conducted outside of the 25-foot undisturbed buffer along the banks of all state waters requiring a buffer on individual residential lots sold to homeowners where all planned construction activities on that lot have been completed and have undergone final stabilization; d. Infrastructure construction projects that consist solely of routine maintenance for the original purpose of the facility that is performed to maintain the original line and grade and the hydraulic capacity, as applicable. The construction activity shall, as a minimum, implement and maintain best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the �Manual for Erosion and Sediment Control in Georgia� (Manual) published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity is being conducted. In order to be eligible for this exemption the project must comply with the following conditions: (i) no mass grading shall occur on the project, (ii) the project shall be stabilized by the end of each day with temporary or permanent stabilization measures, (iii) the project shall have a duration of less than 120 calendar days, and (iv) final stabilization must be implemented at the end of the maintenance project; e. Infrastructure road construction projects that consist solely of routine maintenance for the original purpose of the facility that is performed to maintain the original line and grade and vehicular capacity, as applicable. The construction activity shall, as a minimum, implement and maintain best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the �Manual for Erosion and Sediment Control in Georgia� (Manual) published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity is being conducted. In order to be eligible for this exemption the project must comply with the following conditions: (1) no mass grading shall occur on the project, (2) the project shall be stabilized by the end of each day with temporary or permanent stabilization measures, (3) the project shall have a duration of less than 120 calendar days, and (4) final stabilization must be implemented at the end of the maintenance project; f. Railroad construction projects and emergency re-construction conducted pursuant to the Federal Railway Safety Act, the Interstate Commerce Commission Termination Act and which consist solely of routine maintenance for the original purpose of the facility that is performed to maintain the original line and grade and the hydraulic capacity, as applicable. The construction activity should, at a minimum, implement and maintain best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation consistent with the requirements of the Federal Railway Safety Act and applicable requirements of the Clean Water Act; g. Agricultural operations as or silvicultural land management activities within areas zoned for these activities; and, h. Repairs to any stormwater management facility or practice deemed necessary by the county administrator (or designee). (b) Stormwater management criteria. All stormwater management plans shall meet all policy, criteria, and requirements, including technical specifications and standards in the latest edition of the Georgia Stormwater Management Manual and the Latest edition of the County's Local Stormwater Management Manual. For the proper implementation of the requirements of this article. The word �should� as printed in the Georgia Stormwater Management Manual is changed to �shall� in all references. ## History (Ord. of 4-10-2018)