Sec. 26-354. Stormwater concept plan and consultation meeting.

About this text

  • As published by Municode, current through 2023-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Before any stormwater management permit application is submitted, it is required that the land owner, developer, and/or design professional meet with the county stormwater manager (or designee) for a consultation meeting on a concept plan for the post-development stormwater management system to be utilized in the proposed land development project.

The purpose of this meeting is to discuss the post-development stormwater management measures necessary for the proposed project, as well as to discuss and assess constraints, opportunities and potential ideas for stormwater management designs before the formal site design engineering is commenced.

To accomplish this goal the following information shall be included in the concept plan which shall be submitted in advance of the meeting:

(1) Existing conditions/proposed site plans. Existing conditions and proposed site layout sketch plans, which illustrate at a minimum: existing and proposed topography;

potential impacts on perennial, intermittent and ephemeral streams (note: final stream classification determination will be determined by the county); mapping of predominant soils from soil surveys; boundaries of existing predominant vegetation, proposed limits of clearing and grading, and location of existing and proposed roads, buildings, parking areas and other impervious surfaces and existing improvements.

(2) Natural resources inventory. A short written or graphic inventory of the natural resources at the site and surrounding area as it exists prior to the commencement of the project. This description should include a discussion of soil conditions, forest cover, topography, wetlands, and other native vegetative areas on the site, as well as the location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, downstream receiving waters (name and classification(s)), stream buffers and other setbacks (e.g., drinking water well setbacks, septic setbacks, etc.). Particular attention should be paid to environmentally sensitive features that provide particular opportunities or constraints for development.

(3) Stormwater management system concept plan. A written or graphic concept plan of the proposed post-development stormwater management system including: preliminary selection and location of proposed structural stormwater controls; location of existing and proposed conveyance systems such as grass channels, swales, and storm drains;

flow paths; location of floodplain/floodway limits; relationship of site to upstream and downstream properties and drainages; and preliminary location of proposed stream channel modifications, such as bridge or culvert crossings.

(4) Local watershed plans. The county watershed projection plan (if applicable), and any relevant resource protection plans will be consulted in the discussion of the concept plan.

History

The history line the source prints at the end of the section.

(Ord. of 4-10-2018)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:peach-county/code/26-354@2023-11-14-14d43a2475

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Peach County Code of Ordinances, Sec. 26-354. Stormwater concept plan and consultation meeting | Georgia Commons