Downstream over bank flood and property protection shall be provided by controlling (attenuating) the post-development peak discharge rate to the predevelopment rate for the 25-year, 24-hour return frequency storm event. If control of the one-year, 24-hour storm under section 26-359 is exempted, then peak discharge rate attenuation of the two-year through the 100-year return frequency storm event must be provided.