Plans and specifications are to be prepared based on appropriate planning and applicable planning criteria standards and requirements. All road design not associated with subdivision designs shall be designed in accordance with requirements of articles "XIV Design Standards" and "XV Required Subdivision Improvements" of the Peach County Comprehensive Land Development Resolution, and plans of such roads prepared by a licensed Georgia professional engineer. Subdivision roads shall be designed in accordance with the Peach County Comprehensive Land Development Resolution. Any road construction requiring [a] disturbed area of one acre or more or the addition of 5,000 square feet of impervious area must meet the requirements of the Georgia Stormwater Management Manual, Peach County Stormwater Design Manual, Georgia Soil and Water Conservation Commission erosion control requirements, and approval of erosion, pollution, and sediment control plans, and Georgia NPDES permit requirements.