--- title: Pierce County Code of Ordinances, Sec. 14-100. Pond, lake, dam, and spillway/flood control structure requirements collection: local-codes id: local-code:pierce-county/code/14-100 cite_as: Pierce County, Ga., Code of Ordinances § 14-100 canonical_url: https://georgiacommons.org/counties/pierce/code/14-100 md_url: https://georgiacommons.org/counties/pierce/code/14-100.md text_url: https://georgiacommons.org/counties/pierce/code/14-100/text source_url: https://library.municode.com/ga/pierce_county/codes/code_of_ordinances date: 2025-01-07 status: active jurisdiction: county:pierce jurisdiction_name: Pierce County county_fips: "13229" corpus_version: local-codes-pierce-county-9a1de177b369 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/counties/pierce/code/~part-ii/~chapter-14/~article-ii/~division-4.md previous: https://georgiacommons.org/counties/pierce/code/14-83-to-14-99.md next: https://georgiacommons.org/counties/pierce/code/16-1-to-16-18.md index: https://georgiacommons.org/counties/pierce.md branch: code edition: As published by Municode, current through 2025-01-07 edition_date_kind: current_through source_publisher: Municode version_id: local-code:pierce-county/code/14-100@2025-01-07-31a37ab87b --- # Pierce County Code of Ordinances, Sec. 14-100. Pond, lake, dam, and spillway/flood control structure requirements > As published by Municode, current through 2025-01-07 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 14 - FLOODS / Article II - FLOOD DAMAGE PREVENTION / Division 4 - POND, DAM, LAKE AND SPILLWAY OR FLOOD CONTROL STRUCTURES The construction of ponds, lakes, dams, or spillways in Pierce County are permitted for agricultural purposes only. The property owner shall acquire a permit from the Pierce County Planning and Codes Office prior to the construction of a pond, lake, dam, or spillway. The construction of ponds, lakes, dams or spillways within Pierce County, Georgia shall comply with the requirements set forth below, as well as any additional requirements needed to preserve the surrounding land used for agricultural purposes, to protect adjoining property owners, and to protect county rights-of-way including, road and drainage pipes. The following requirements are not intended to supersede or contradict any State or Federal regulations pertaining to the construction of ponds, lakes, dams, spillways or watercourses. All State and Federal permits shall be properly obtained and presented to the Pierce County Planning and Codes Office when applying for a local permit. Requirements for constructing a pond, lake, dam, or spillway: (1) No part of a pond or lake shall be constructed closer than 150 feet from any public right-of-way, or public/private easement. If the width of an easement containing a public roadway cannot be determined, 30 feet shall be added to the 150-foot setback, and shall be measured from the centerline of the roadway; (2) Ponds or lakes shall not be constructed closer than 30 feet from a property line, but at no time shall be closer than 150 feet to an existing residence on an adjoining parcel (said measurements are to be measured from maximum fill line); (3) The pond or lake shall have a spillway constructed, which allows the overflow to follow the natural drainage course. A stamped site plan review must be prepared and stamped by a registered Georgia engineer or surveyor. Additionally, a letter of final approval must be provided by a registered Georgia engineer upon completion; (4) Any pond or lake constructed closer than 150 feet to a public or private roadway, and the enclosure/water impounding area of the pond or lake is located below, or at the same grade as the roadway, shall require the installation of a guardrail to prevent vehicle entry from the road. A guardrail may not be necessary if vegetation exists between the pond or lake and the roadway, which would reasonably prevent vehicle entry from the road. If the pond or lake is located closer than 150 feet to the roadway, and is at a grade above the roadway, a guardrail may be required, if vehicle entry from the roadway is possible. The Pierce County Road Superintendent, or a Georgia Licensed Highway Engineer, shall determine if a guardrail is required, and the guardrail shall be constructed according to the requirements and specifications of the Georgia Department of Transportation or Federal Highway Safety Standards. All costs for the installation of the guardrail, if required by the permit application, shall be born by the pond, lake, or dam owner and shall be installed by the Pierce County Road Department or their certified designee to ensure proper installation and location; (5) Any dam or spillway, which shall be built to control the overflow of a pond or lake, shall be constructed to anticipate, at a minimum, a 100-year flood event. No connections to any Pierce County pipes shall be made until approved by the county road superintendent which shall be noted on the final permit; a. If connections to Pierce County owned pipes is approved, the connection must be made by a highly qualified contractor, with documented experience in making the proper fitted connections; b. Collars shall be used which shall be sufficient to prevent leakage from the connection site at all times; c. Pipes shall be equipped with approved control devices, to allow for the complete shut-off of water flowing through the pipes and shall be inspected, by the property owner, on a regular basis to insure proper operation at all times; d. Random inspections of all ponds, dams, spillways, pipes, and control valves will be conducted by Pierce County personnel to ensure that all equipment is in proper working condition, free of debris and/or beaver dams or other blockages, and ready for any emergency event that may take place requiring the flow of water to be stopped in a timely manner to prevent hazards to public or private property downstream from the pond or lake; 1. If designated county inspector finds defects in the pond, lake, dam, spillways, pipes, or shut-off valves, the inspector shall notify the owner who will have a designated amount of time to correct the issues present, but such time shall not exceed 30 days; 2. Failure to comply with the notification may result in fines of $100.00 per day; 3. If maintenance is conducted by the county, to protect public rights-of-way or other property in the event of a natural disaster, all activities shall be billed to the property owner using the current Federal Emergency Management rates for all equipment and personnel costs needed to eliminate the deficiency; 4. Failure to remit payment to the county for services rendered at the time due, may result in additional penalties, including liens placed on the personal assets of the property owner; 5. In extreme cases where a property owner fails to comply with orders by or payments to the county, the owner's property may be forfeited to Pierce County; e. The property owner shall bear all costs associated with the pipe connections, installations, and all other costs associated with proper maintenance of the pipes, which are located on the property owners side, of the properly installed collar of the drain control system; f. When it is deemed necessary, the county reserves the right to cutoff the flow of water in order to maintain, repair, and provide upkeep to the pipes and roadways to prevent damage to the county right-of-way. If locks are installed on valves or closures, the county road superintendent shall be provided a key, at the time of the installation, to allow ready access in the event of an emergency situation; g. A stamped site plan review must be prepared and stamped by a registered Georgia engineer or surveyor. Additionally, a letter of final approval must be provided by a registered Georgia engineer upon completion. (6) In an effort to ensure that projects are completed in a timely manner, the property owner shall be required to secure a performance bond in the amount of $5,000.00. ## History (Ord. No. 11-03-01, § 1(Exh. A), 11-3-2020)