In all areas of special flood hazard the following provisions are required: (1) New construction and substantial improvements shall be anchored to prevent flotation, collapse or lateral movement of the structure; (2) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for resisting wind forces; (3) New construction and substantial improvements shall be constructed with materials and utilities resistant to flood damage; (4) New construction or substantial improvements shall be constructed by methods and practices that minimize flood damage; (5) Electrical, heating, ventilation, plumbing, air conditioning equipment and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding; (6) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system; (7) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters; (8) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding; (9) Any alteration, repair, reconstruction or improvements to a building which is in compliance with the provisions of this article shall meet the requirements of new construction, as contained in this article; (10) Any alteration, repair, reconstruction or improvements to a building which is not in compliance with provisions of this article shall be undertaken only if such nonconformity is not furthered, extended, or replaced.